Seattle at a glance | Electric utility | Seattle City Light (SCL) |
| Electrical permits | Seattle Department of Construction and Inspections (SDCI) |
| From our Bothell base | About 25 minutes |
| Licence | WA Electrical Contractor # HBPOWPE758PO (General (01)) |
| Completed work here | New 100 A subpanel, EcoFlow Smart Home Panel 2 with a Delta Pro Ultra battery, 50 A generator inlet with a panel interlock, and a 60 A hardwired circuit for an Emporia Pro EV charger. (December 2025) |
Seattle is the busiest part of our route, and the part with its own rules. Electrical permits here come from the Seattle Department of Construction and Inspections rather than Washington L&I, a contractor needs a Seattle business licence to pull one, and Seattle City Light — not PSE — decides which rebates a building can claim. HB Power Electric has pulled ten SDCI electrical permits since December 2025; nine are complete and inspected. That work has been residential so far: subpanels, a generator inlet, a 60 A EV charger, panel replacements, a whole-house rewire, ADU circuits and bathroom circuits. On the commercial side we bid tenant improvements, refrigeration and rooftop controls, and lighting retrofits that qualify for City Light's commercial incentives.
Who permits electrical work in Seattle
Seattle is not an L&I inspection jurisdiction. SDCI issues the electrical permit and does the inspection, and the contractor must hold a Seattle business licence to buy one. Fees are set by SDCI, not by the L&I schedule, so the L&I fee anchors on our pricing page do not apply inside the city.
Seattle Department of Construction and Inspections (SDCI) — permit information ↗
Whichever office it is, the contractor buys the permit before work starts, which is what
WAC 296-46B-901 requires. We pull it and we schedule the inspection.
What SCL pays for in Seattle
Seattle City Light also serves parts of Shoreline, Lake Forest Park, Burien, Tukwila, SeaTac and north Renton. If your bill comes from PSE, the rebate table on our rebates page is the one to read instead.
Utility incentives are set by Seattle City Light, Puget Sound Energy, Snohomish County PUD and Tacoma Power and change without notice. Figures were last verified on 5 September 2026. Most programs require pre-approval before equipment is purchased; HB Power Electric helps prepare applications but cannot guarantee approval or amounts.
Every SCL programme, with sources and dates →
What we do most in Seattle
Seattle City Light pays small businesses up to 100% of a Level 2 site, and SDCI permits every residential charger.
Windstorm outages and tree cover over the lines make smart panels and generator inlets the most-asked-for job here.
Older Seattle housing stock plus a heat pump, an EV and an induction range is the classic reason a 100 A service runs out.
Mini-split and makeup-air hookups for HVAC contractors, and rooftop refrigeration controls for restaurants and grocers.
Work we have done in Seattle
- Northeast Seattle — EcoFlow Smart Home Panel 2 over a new 100 A subpanel, an Emporia Pro EV charger and a 50 A generator inlet with interlock, permitted through SDCI (permit 7121395-EL).
- Columbia City — a Mitsubishi mini-split outdoor unit with a new disconnect and weatherproof junction box on lap siding.
- Madison Park — makeup-air unit and inline electric heater controls in a crawlspace: contactor, 24 V transformer and the interlock that ties the heater to the fan.
New 100 A subpanel, EcoFlow Smart Home Panel 2 with a Delta Pro Ultra battery, 50 A generator inlet with a panel interlock, and a 60 A hardwired circuit for an Emporia Pro EV charger.
Neighbourhoods and nearby cities
We cover Ballard, Fremont, Wallingford, Green Lake, Ravenna, Wedgwood, Maple Leaf, Northgate, Capitol Hill, Madison Park, Columbia City, Beacon Hill, West Seattle, Magnolia, Queen Anne, Georgetown and SoDo , about 25 minutes from our Bothell base.
Nearby: Bellevue · Bothell · Everett · every city we cover
Seattle questions
Who issues electrical permits in Seattle — L&I or the city?
The city. Seattle is one of the Washington jurisdictions that does its own electrical permitting and inspection, through SDCI. Washington L&I permits and inspects most of the rest of our route, including Bothell, Kenmore, Issaquah, Kent and Edmonds. The practical difference for you is the fee schedule and the inspection queue; either way the contractor buys the permit before work starts, which is what WAC 296-46B-901 requires.
How does a service upgrade get coordinated with Seattle City Light?
City Light has to disconnect and reconnect the service, and on many older properties it also has to confirm the mast, weatherhead and meter position before the work is scheduled. That coordination usually sets the calendar rather than the electrical work itself. We file the SDCI permit and the City Light service request together and give you the realistic date once City Light answers, not before.
Does Seattle's Building Emissions Performance Standard affect my building?
It applies to larger non-residential and multifamily buildings, with verification starting in 2027 and emissions targets from 2031; all-electric buildings are exempt from the targets. If you own a building in scope, the electrical work that usually follows is lighting and controls, heat-pump circuits and panel capacity. Separately, the state Clean Buildings Tier 2 deadline of 1 July 2027 catches buildings of 20,001–50,000 square feet.
Can a condo owner in Seattle install an EV charger in the building's garage?
Since 1 January 2026, RCW 64.90.530 stops Washington condominium and HOA governing documents from banning an owner's EV charging installation, though the association can still set reasonable conditions on placement, metering, insurance and who pays. In practice the constraint in a Seattle high-rise is electrical, not legal: the house panel's spare capacity and the route from it to your stall. We do that load calculation before quoting.